4553 ABALONE STREET, BREMERTON WA 98312

We can start using our kitchen once our counter tops are in.  The Counter Top installers are waiting on the floor cabinets to be completed.  We were told to wait on the filler.  Can we prioritize getting the cabinets set in place so we can contact the counter top installer.  Below is a list of items we need ordered / fixed.

Cabinet Damage

You can see a support board is no longer connected to the back.  It is seperated.  The back is bent and pulled away from the support board.  Can this be fixed?


Vent Covered

The vent use to be located here with the old cabinets.  The cabinet is now sitting on top of the vent.  We would like the vent to be accessible again.


Remove Filler on Right Side of refrigerator

Remove the wood that is flush against the refrigerator side so it is not tight and has more room.


Knobs / Handles

Place Handles on the cabinets


Microwave

Attach Microwave to Cabinet and Cut Hole for Vent


Electrical Covering

Place Cover back on outlet


Cover Gap at Top

Can we order something to cover the gap between the cabinets and ceiling or is this part of the molding?

Molding

Needs to be placed on the cabinets


Clips / Hinges

  • arriving January 11, source Xena at Bremerton Lowes
  • They are not hinges but something that connects to them?